Closing soon

BOILER UPGRADES Barton Tower and Barton Annex Solicitation No. 10102026

Description: Notice is hereby given that the Indianapolis Housing Agency will receive proposals until 3:00 p.m., local time, on November 20, 2026, for the following project: BARTON TOWER AND BARTON ANNEX BOILER UPGRADES 555 Massachusetts Avenue / 501 North East Street Indianapolis Housing Agency Indianapolis, Indiana Solicitation No. 10102026 Prime contract work proposals are desired for total construction of the work as described in the Specifications and Drawings on file and available to contractors at the offices of the Architect, Alliance Architects, 929 Lincolnway East, Suite 200, South Bend, Indiana 46601, and Contractors may request electronic copies at info@alliarch.com. Proposals shall be submitted on the bidder's letterhead on or before the date and time established above. A pre-bid site visit is scheduled for November 13, 2026, at 2:30 p.m., starting at Barton Annex, 501 North East Street. This will be the only time the site will be available for inspection during the proposal period. Project description / summary of work: Furnish all labor, OEM parts, materials, tools and equipment to perform one-time service and minor repair of six (6) condensing boilers (three AERCO Benchmark BMK 2500 at Barton Tower and three Lochinvar CREST FBN2001 at Barton Annex) and associated equipment. Work includes furnishing and installing OEM rebuild kits for each boiler, full annual service and combustion tuning, servicing heat exchangers at Barton Annex (plate-and-frame and tube), assessment/inspection/clearing of combustion and ventilation air including camera (borescope) inspections, conversion of the common combustion-air header at Barton Annex to three independent 8-inch pipes through the exterior wall, replacement of one OEM AERCO control panel at Barton Tower (unit pricing provided for additional replacements), cooling tower service at each building, obtaining required permits and completing CSD-1 (or equivalent) operating certifications, providing all safety measures, and delivering service reports, warranty documentation and closeout documents. The Contractor must verify field conditions and dimensions, comply with HUD-5370-EZ General Conditions and prevailing wage/Davis-Bacon requirements (General Decision Number IN20260002), maintain required insurance, and meet submittal, warranty and closeout obligations. Qualifications prior to award include evidence of five years' verifiable experience servicing commercial condensing boilers of 2,000 MBH or larger, AERCO Benchmark and Lochinvar CREST manufacturer certifications, a sample combustion analysis report, and references for three similar projects within the last 36 months. The Contractor agrees to complete the Work within thirty (30) calendar days from Acceptance of Proposal. All bidders must have an "Active" registration in the System for Award Management (SAM) and provide proof at time of proposal submission.

Buyer
Bremen Public Housing Agency

SpecialDistrict · IN, US

Released
Nov 5, 2026
Closes
Nov 20, 2026(3 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts