Pump Station R Rehabilitation RFP
Work inlcudes rehabilitate sewage pump station "r", the station is a wastewater lift station with a submersible wet well plus valve and flowmeter vaults.
Description: Seeking bid for blackjack pump station.
City · TX, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
582 days before RFP
Aubrey staff proposed a $44,000 engineering agreement to update the citywide water and wastewater capital improvement program, including pump stations and ground storage reservoirs, using impact-fee funds.
City Council Meeting Staff Report February 27, 2025 Agenda Item Approve a Professional Engineering Services Agreement with Birkhoff, Hendricks, and Carter for a Water and Wastewater Impact Fee update in an amount not to exceed $44,000; and authorize the City Manager to execute necessary documents. Staff Contact Leanne Wilson, Executive Director of…
City Council Meeting Minutes
Agenda packet · Feb 27, 2025
Board meeting
400 days before RFP
The adopted FY2025–2026 CIP budget includes water pump station and storage improvements.
FISCAL YEAR 2026 ADOPTED BUDGET Prepared by: Charles Kreidler, City Manager Michael English, Finance Director Ciana Kelly-Ellis, Budget Analyst Adopted by the City Council on August 28, 2025 Mayor and City Council FISCAL YEAR 2026 PROPOSED BUDGET EXECUTIVE SUMMARY OUR MISSION "To build a sense of community that is innovative, cooperative, streamlined, and…
RFP published
Proposals due (Closed)
City of Aubrey Annual Budget
Board meeting · Aug 28, 2025
Decision makers connected to this RFP from City of Aubrey.
These related opportunities are still open for bidding.
CityFL
Posted
Oct 15, 2026
Nov 16, 2026
Work inlcudes rehabilitate sewage pump station "r", the station is a wastewater lift station with a submersible wet well plus valve and flowmeter vaults.
CityPA
Posted
Oct 18, 2026
Dec 8, 2026
Provide Contract 1 - General construction and mechanical, site, and related work and contract 2 electrical work associated with the replacement and modification of components of the existing submersible pumping station.
CityNC
Posted
-
Dec 2, 2026
Work consists of upgrading the riverdale pump station from 30 mgd to 45 mgd, including demolition and modifications to existing facilities; installation of new pumps, piping, odor control, generator, and electrical building; electrical, instrumentation, and scada improvements; and associated utility and site work, temporary bypass pumping to maintain continuous wastewater service during construction, startup, testing, and commissioning.
CountyGA
Posted
Oct 21, 2026
Dec 8, 2026
The project scope includes rehabilitation of the existing Patterson Pump Station including mobilization and demobilization, bypass pumping, demolition of facilities to be removed, excavation and grading, structural rehabilitation of the wet well and Grinder Room, modifications to the bridge crane canopy, installation of slide gates, a carbon filter odor control system and associated ductwork, gravity sewer with new Diversion Structure, recoating of all piping in the wet well and valve vault, generator enclosure, and existing surge tank, associated site improvements and other facility upgrades per contract documents including site concrete paving, site fencing, an asphalt access driveway, finish grading, erosion control and site stabilization.