CityMA
Posted
Sep 16, 2026
Oct 16, 2026
Wastewater Pump Impeller and Volute Replacement - Central Ave Pump Station RFP
Wastewater Pump Impeller and Volute Replacement - Central Ave Pump Station.
Description: This RFP is for the installation of an owner-provided wastewater pump station and standby natural gas generator, extension of existing wastewater systems, and associated site work including excavation, trenching, installation of structures, electrical equipment, fencing, bollards, gravel access road, concrete pads, and site restoration.
City · OR, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityMA
Posted
Sep 16, 2026
Oct 16, 2026
Wastewater Pump Impeller and Volute Replacement - Central Ave Pump Station.
Special DistrictNC
Posted
Sep 22, 2026
Oct 26, 2026
Construction of the Southwest Wastewater Pump Station and Force Main will be received by Harnett Regional Water. The project consists of one (1) contract with two (2) sections. Section A includes the upgrade of the existing SLS #57 sewer pump station including headworks modifications, replacement of two (2) existing 100 HP submersible pumps, new lime feed system, and electrical, SCADA, and controls. Section B includes the installation of 26,220 LF of 20” sewer force main, and all appurtenances. The project shall include all sitework, piping, fittings, valves, appurtenances, and other items required.
CityAL
Posted
Sep 24, 2026
Oct 22, 2026
The project generally consists of rehabilitation of the wastewater pump stations, including replacement of pumps, guide rail systems, controls and level-control equipment; wet-well cleaning; electrical modifications; testing; startup; and related work.
CityNJ
Posted
Sep 8, 2026
Oct 21, 2026
The Township of Hamilton is soliciting qualifications and proposals for professional engineering services related to wastewater pump station collection through a fair-and-open process. The contract term is January 1 through December 31, 2027, and the posting identifies the scope as engineering services for wastewater pump station collection. Proposals are due October 21, 2026, at 10:00 a.m. ET, and questions are due October 15, 2026, at noon ET.
Decision makers connected to this RFP from City of Cottage Grove.