CityNC
Aug 4, 2026
Closes
Sep 1, 2026
BHS CONTROL ROOM RELOCATION ITB NUMBER: AVIA 27-04
The project involves the interior upfit of approximately 2,000 square feet of existing shell space on the baggage level of the main terminal at CLT Airport, including a baggage handling system (BHS) control room, support space, and a break room, with predominant work consisting of typical finishes such as drywall, ceilings, flooring, mechanical, electrical, plumbing, and fire protection.