BHS Control Room Relocation
Aug 4, 2026
Closes
Sep 1, 2026
Project involves the interior upfit of approximately 2,000 square feet of existing shell space on the baggage level of the main terminal at clt airport, including a baggage handling system (bhs) control room, support space, and a break room. The predominant work will consist of typical finishes such as drywall, ceilings, flooring, mechanical, electrical, plumbing, and fire protection.
