Carl A. Kroch Library Storm Drain Repair RFP
Work includes storm drain repairs.
Description: The City of Alameda is soliciting bids for the Bethlehem Storm Drain Repair Project, which includes furnishing labor, tools, equipment, and materials for the installation of a storm drain arch culvert, manhole, connecting storm pipe, excavation, shoring, backfill, compaction, dewatering, bypassing, grading, and site restoration.
City · CA, US
From the first pre-RFP signals to the published RFP and its files.
Strategic plan
554 days before RFP
The City’s stormwater modeling identified intersections at risk of flooding because of undersized pipes, undersized pump stations, or high-tide drainage limitations.
The City has also modeled the existing stormwater collection system and determined what intersections are at risk of flooding during a 10-year storm and 25-year storm due to undersized pipes, undersized pump stations, or the inability to drain during high tides. Maps showing collection system-related flooding potential are shown in Appendix H. The City's…
City of Alameda Climate Adaptation and Hazard Mitigation Plan 2022-2026
Strategic plan · Apr 1, 2025
Strategic plan
554 days before RFP
The City completed stormwater cleaning and condition assessments for three watersheds and planned an additional watershed assessment for 2024–25.
In 2013, the City's storm drain outfalls were assessed visually for capacity, condition, and operation and maintenance prioritization. An updated comprehensive cleaning and condition assessment for the entire stormwater system has been completed for three watersheds totaling $650K. An additional watershed is planned for 2024-25 totaling $250K. Annual…
City of Alameda Climate Adaptation and Hazard Mitigation Plan 2022-2026
Strategic plan · Apr 1, 2025
Strategic plan
220 days before RFP
The City’s Strategic Plan lists Public Works’ ongoing plan to design and implement stormwater upgrades, including storm-drain cleaning and increased pump-station capacity, across fiscal years 2023/24 through 2026/27.
BUILD RESILIENCE TO CLIMATE CHANGE & WATER LEVEL RISE # Projects Fiscal Years Department(s) Status 23/24 24/25 25/26 26/27 CC8 Design and implement upgrades for stormwater infrastructure to reduce local flooding, including the cleaning of storm drains and increasing pump station capacity ■ ■ ■ ■ PW →
City Of Alameda Strategic Plan 2026-2027
Strategic plan · Mar 1, 2026
Strategic plan
128 days before RFP
The draft plan records an ongoing I1 action to upgrade storm-drain pump stations and replace storm-drain pipes and culverts to reduce surface flooding.
I1 Critical Public Assets. Ensure resilience and long-term functionality of critical public assets threatened by earthquakes, sea level rise or rising groundwater. a. Upgrade storm drain pump stations and replace storm drain pipes and culverts, and drainage improvements to reduce surface flooding. b. Replace sewer pipes to decrease groundwater and Dam…
City of Alameda Climate Adaptation and Hazard Mitigation Plan 2026
Strategic plan · Jun 1, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (4 days left)
a. Upgrade storm drain pump stations and replace storm drain pipes and culverts, and drainage improvements to reduce surface flooding. b. Replace sewer pipes to decrease groundwater and Dam Failure Earthquake Ground Shaking Flooding Liquefaction AMP Planning, Building and Transportation Public Works Ongoing Facility Maintenance Fund 706, HMGP, BRIC, AMP and…
City of Alameda Climate Adaptation and Hazard Mitigation Plan 2026-2030
Strategic plan · Sep 16, 2026
Decision makers connected to this RFP from City of Alameda.
Adjacent opportunities open for bidding right now.
Higher EducationNY
Posted
-
Oct 28, 2026
Work includes storm drain repairs.
CityTX
Posted
-
Nov 3, 2026
Replacement of approximately 90 linear feet of 36” reinforced concrete pipe (RCP) and the placement of a five-foot concrete manhole in NB Coit Road and an alternate bid for the placement of a five-foot concrete manhole and the cleaning out of approximately 90 linear feet of 36” RCP. Both bids will include the placement of an approved traffic control plan and the removal and replacement of existing concrete pavement and flex base.
University Of California San Francisco
Higher EducationCA
Posted
Oct 16, 2026
Nov 4, 2026
Work consists of emergency storm drain repair, include the removal of the existing, non-functional corrugated steel storm drain. Removal of existing asphalt and corrugated galvanized pipe; Installation on new JENSEN drain inlets and grates; Installation of new 15" & 8" PVC SDR 26.
Arizona Department of Transportation
State AgencyAZ
Posted
-
Jan 15, 2027
Project consists of widening the existing roadway by constructing new asphalt concrete pavement. Additional work includes constructing curb and gutter and sidewalk, reconstructing curb ramp returns, and driveways, relocating property wall, constructing storm drain, relocating water facilities, installing street lighting, pavement marking, signing, seeding, and other miscellaneous work.