Closed

Bay Village Development Walkway Replacement Phase V

Description: Project consists of: installation of erosion control measures and tree protection; saw cutting of asphalt and concrete; removal and disposal of existing bituminous concrete and concrete walkways/areas; disposal of excavated material; remove and reset curbing; furnish and install new precast concrete & granite; installation of root barrier & tree protection; tree root pruning, preparing the walkway subgrade; concrete and subgrade material testing; protection of work; loam and seed areas; and construction of concrete walkways and ADA accessible ramps areas throughout the development.

Buyer
New Bedford Housing Authority

SpecialDistrict · MA, US

Released
Aug 5, 2026
Closes
Aug 20, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts