Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 641 SF of construction signs; 10 EA of type III moveable barricade; 2,975 LF of temporary removable marking tape 4", white; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Approx. 0.700 AC Tree removal, acres; 257 CY earth excavation; 120 P nitrogen fertilizer nutrient; 3,382 SY erosion control blanket; 1,531 ft perimeter erosion barrier; 1,245 P bituminous materials (tack coat); 763 SY hot-mix asphalt shoulders, 10"; 141 LF pipe underdrains for structures 4". See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Approx. 0.700 AC Tree removal, acres; 257 CY earth excavation; 120 P nitrogen fertilizer nutrient; 3,382 SY erosion control blanket; 1,531 ft perimeter erosion barrier; 1,245 P bituminous materials (tack coat); 763 SY hot-mix asphalt shoulders, 10"; 141 LF pipe underdrains for structures 4". See outside link.
Premium
Access the largest public sector contact database
Bridge 9 pier 4 improvements for the public works department.
Posted Date
Dec 9, 2025
Due Date
Dec 30, 2025
Release: Dec 9, 2025
Close: Dec 30, 2025
Bridge 9 pier 4 improvements for the public works department.
AvailableNew bridge will be approx. 19' long and 27' wide and when finished will have an 8" concrete deck. Contractor shall: Form and pour two (2) concrete head walls (caps) 3' by 3' by 27'. Head walls shall include two (2) layers of steel reinforcing rod, two (2) 7 5/8 pipes supporting 8" channels set at height of cap. Set and weld bridge beams. Install metal deck form (stay in place form), place and tie 2 layers of reinforcing steel. See attached file.
Posted Date
Dec 4, 2025
Due Date
Dec 26, 2025
Release: Dec 4, 2025
Close: Dec 26, 2025
New bridge will be approx. 19' long and 27' wide and when finished will have an 8" concrete deck. Contractor shall: Form and pour two (2) concrete head walls (caps) 3' by 3' by 27'. Head walls shall include two (2) layers of steel reinforcing rod, two (2) 7 5/8 pipes supporting 8" channels set at height of cap. Set and weld bridge beams. Install metal deck form (stay in place form), place and tie 2 layers of reinforcing steel. See attached file.
AvailableWork includes 492.800 TN of bituminous pavement mixture PG58-28H, (BP-1); 877.600 TN of asphaltic concrete mixtures PG 70-22 (SP125C mix); 1,963.400 TN of asphaltic concrete mixture PG 64-22 (SP190C mix); see attached files.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes 492.800 TN of bituminous pavement mixture PG58-28H, (BP-1); 877.600 TN of asphaltic concrete mixtures PG 70-22 (SP125C mix); 1,963.400 TN of asphaltic concrete mixture PG 64-22 (SP190C mix); see attached files.