Jul 24, 2026
Closes
Aug 20, 2026
Storage Tank Removal Project
Provide an underground storage tank removal project involving excavation and disposal of 2 tanks, associated piping, and residual liquids.
Description: Santa Clarita Valley Water Agency is soliciting bids for the Avenue of the Oaks Tank 2 Tank Coating Project, which involves exterior spot repairs and overcoat painting plus complete interior relining. The work also includes removal and disposal of existing linings and project waste, application of epoxy and urethane coatings, polyurethane caulking, cleaning, and disinfection. Bids are submitted electronically with a completed bid form, and a mandatory pre-bid meeting is scheduled at the project site on August 27, 2026.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Jul 24, 2026
Closes
Aug 20, 2026
Provide an underground storage tank removal project involving excavation and disposal of 2 tanks, associated piping, and residual liquids.
Santa Clarita Valley Water Agency
Special DistrictCA
Aug 18, 2026
Closes
Sep 29, 2026
Santa Clarita Valley Water Agency is soliciting a lump-sum electronic bid for the Ridge Route Tank Relining Project, not a grant program. The work includes surface preparation and protective coatings, removal and replacement of existing interior linings and a corroded interior ladder, corrosion-related grinding and weld repairs, a new welded steel ring halo, replacement of up to five roof rafters, and associated work. A mandatory onsite pre-bid meeting is listed for 08/27/2026 8:15 AM (PDT) at approximately 33652 Ridge Route Road, Castaic, and bids are due 09/29/2026 11:00 AM (PDT).
CityCA
Jul 24, 2026
Closes
Aug 21, 2026
Provide field verification; furnish new ASME pressure tank; remove/dispose of existing tank; install new tank; reconnect piping; furnish valves/fittings/anchors as required; perform startup, pressure testing, leak testing, and commissioning; provide O&M manuals, warranties, and training.
CityIN
Aug 5, 2026
Closes
Aug 27, 2026
Work includes elevated water tank surface preparation, painting and miscellaneous repairs: this contract consists of repainting and miscellaneous improvements to a 250,000 gallon spheroid elevated water tower. The estimated low water line is 102.75 feet from nameplate. The improvements include the following: exterior surface: high pressure water cleaning (5,000 to 10,000 psi), spot power tool clean to a sspc-sp11 standard, and application of a three (3) coat epoxy urethane system. Pit piping: abrasive blast clean to a sspc-sp6 commercial standard, and apply a two (2) coat epoxy system. Altitude vault: abrasive blast clean to a sspc-sp6 commercial standard existing piping as shown. Remove existing altitude valve as shown and apply (2) coat epoxy system. Make air handling intake duct improvements as shown. Foundation: water clean and apply two (2) coat epoxy system. Cathodic protection system furnish and install.
Procurement and program contacts connected to Santa Clarita Valley Water Agency.