Recycled Water Tank Replacement Project RFP
Jul 24, 2026
Closes
Aug 21, 2026
Provide field verification; furnish new ASME pressure tank; remove/dispose of existing tank; install new tank; reconnect piping; furnish valves/fittings/anchors as required; perform startup, pressure testing, leak testing, and commissioning; provide O&M manuals, warranties, and training.
