E. La Habra Boulevard Street Improvements Project
Work includes 72,450 SF cold mill existing asphalt concrete pavement 1-3/4" uniform depth; 875 SF construct 2" arhm-gg-c overlay; 9,000 SF remove existing ac and ab to subgrade. Construct new ac pavement over compacted native subgrade, with a minimum ac thickness of 10"; 163 LF remove and construct curb and gutter; 10 EA remove and construct curb ramp; 1,655 SF remove and construct sidewalk; 542 SF remove and construct commercial driveway; 573 SF remove and construct cross gutter; 197 LF grind pcc sidewalk;1 EA remove and construct curb drain. See outside link.