CityCA
Posted
Sep 23, 2026
Nov 4, 2026
Avalon Boulevard Improvements Martin Luther King Jr Boulevard To 56th Street (vision Zero Program)
Work includes approx 811 CY unclassified excavation; 1,009 CY crushed miscellaneous base; 724 TN asphalt concrete pavement; 80 EA 2" galvanized conduit, jacked (sidewalk and street); 136 EA 2" PVC conduit, directional boring (sidewalk and street).
