Closing soon

Auto Sampling Flushing Station Installation

Description: Work includes 1 LS construct water service connections; 142 LF construct 6" diameter pvc astm d-3034, sdr 26 drain line by open cut installed in trench, water line, complete in place, all depths, including fittings, embedment, backfill, thrust blocking, surface restoration, sodding/seeding, testing, all appurtenances; 3 EA construct concrete slabs complete-in-place at each site for supporting the auto flusher sampling station equipment. The concrete slab will be 6" thick, 5' long, and 4' wide with #4 rebar at 18" center- on-center each way. Work includes excavation, fill, subgrade compaction, backfill, surface restoration, sodding, testing, forming, reinforcement, concrete. See attached file.

Buyer
City of Beaumont

City · TX, US

Released
Sep 3, 2026
Closes
Sep 24, 2026(14 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts