CityFL
Aug 17, 2026
Closes
Sep 7, 2026
Fire Station 100 Installation of Manual Transfer Switch RFP
The City of Miramar is soliciting bids from qualified contractors to supply and install a single 800-amp, 480-volt, three-phase manual transfer switch with a weather-proof generator tap box at Fire Station 100. The work includes delivery, installation, wiring, grounding, functional testing, and submission of manuals, documentation, and warranty information. The invitation for bid opened on August 17, 2026, and responses are due September 7, 2026, at 2:00 p.m.