Beverly Hills Unified School District
School DistrictCA
Posted
Sep 25, 2026
Oct 15, 2026
Moreno Drive Asphalt Paving RFP
The project consists of grind and overlay
Description: Work consists of asphalt paving services.
SpecialDistrict · OR, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Beverly Hills Unified School District
School DistrictCA
Posted
Sep 25, 2026
Oct 15, 2026
The project consists of grind and overlay
West Virginia Department of Transportation
State AgencyWV
Posted
Sep 7, 2026
Nov 17, 2026
Asphalt paving fort branch - ethel.
CityWI
Posted
Sep 17, 2026
Oct 13, 2026
Hot mix asphalt paving and other work.
CityWV
Posted
Oct 4, 2026
Oct 16, 2026
Fall and spring 2026-2027 asphalt paving project. Mobilization & Traffic Control: Providing all necessary equipment transportation, safety signage, and flaggers to ensure minimal disruption to residents and safe traffic flow. Milling & Edge Tie-Ins: Precision milling to a depth of 2 inches in all designated coverage areas. This includes squaring up joints and handling all necessary edge tie-ins at intersections, driveways, and existing structures to guarantee a smooth transition. Surface Preparation: Mechanical cleaning, sweeping, and removal of all loose debris, dust, and milled material from the sub-base prior to paving. Tack Coat Application: Uniform application of a WV-DOH approved emulsified asphalt tack coat to ensure maximum adhesion between the prepared surface and the new asphalt overlay. Asphalt Installation: Delivery, placement, and compaction of an average of 2" of hot-mix asphalt (HMA).
Decision makers connected to this RFP from Tualatin Valley Water District.