Truckee Donner Public Utility District
Special DistrictCA
Posted
Oct 2, 2026
Oct 27, 2026
2027 Asphalt Maintenance RFP
Asphalt Maintenance.
Description: Fall and spring 2026-2027 asphalt paving project. Mobilization & Traffic Control: Providing all necessary equipment transportation, safety signage, and flaggers to ensure minimal disruption to residents and safe traffic flow. Milling & Edge Tie-Ins: Precision milling to a depth of 2 inches in all designated coverage areas. This includes squaring up joints and handling all necessary edge tie-ins at intersections, driveways, and existing structures to guarantee a smooth transition. Surface Preparation: Mechanical cleaning, sweeping, and removal of all loose debris, dust, and milled material from the sub-base prior to paving. Tack Coat Application: Uniform application of a WV-DOH approved emulsified asphalt tack coat to ensure maximum adhesion between the prepared surface and the new asphalt overlay. Asphalt Installation: Delivery, placement, and compaction of an average of 2" of hot-mix asphalt (HMA).
City · WV, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Truckee Donner Public Utility District
Special DistrictCA
Posted
Oct 2, 2026
Oct 27, 2026
Asphalt Maintenance.
Beverly Hills Unified School District
School DistrictCA
Posted
Sep 25, 2026
Oct 15, 2026
The project consists of grind and overlay
Special DistrictWV
Posted
Sep 5, 2026
Oct 9, 2026
Hot-Mix Asphalt Re-Paving.
Tualatin Valley Water District
Special DistrictOR
Posted
Oct 7, 2026
Oct 20, 2026
Work consists of asphalt paving services.
Decision makers connected to this RFP from City of Nitro.