Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of approx. 12,000 LF of 8" water main including but not limited to replacement of existing water services to curb stops/boxes, installation of water meter pits, testing and disinfection of the new water main, abandonment-in-place of the existing water main between connection points, traffic controls, erosion and sediment controls, and associated pavement and landscape restoration as shown on the construction drawings and as specified in the Project Manual. In certain instances, the work may entail replacement of water services from building to meter pit/curb stop based on service material (i.e., if existing service material determined to be lead or galvanized requiring replacement).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Approx. 1,500 LF of 16" PVC water main replacement; approx. 437 LF of 8" and 6" PVC water main replacement; remove and replace 5 fire hydrants; 20 - 3/4" water service connections; 453 LF of 3/4" Copper water service line; 12 Handicap Accessible Curb Ramps; and 3,300 SY of 2" asphalt mill and overlay.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Approx. 1,500 LF of 16" PVC water main replacement; approx. 437 LF of 8" and 6" PVC water main replacement; remove and replace 5 fire hydrants; 20 - 3/4" water service connections; 453 LF of 3/4" Copper water service line; 12 Handicap Accessible Curb Ramps; and 3,300 SY of 2" asphalt mill and overlay.
AvailableProject consist of approx 1,210 LF of 12" dip watermain; 641 LF of 1" sidr 7 hdpe water service; 1,975 LF of 4" asphalt paving and restoration; 47 LF of curb and gutter; LF of sidewalk. 1 LS mobilization / bonds / insurance (10% max); 1 LS traffic control; 1 LS erosion control; 1 LS water testing and start-up (including temp. Blowoffs and/or air relief); 1 LS Montana rail link permitting and coordination; 7 EA remove and abandon existing valve and valve box; 1 EA remove and abandon existing fire hydrant; 2 EA remove and abandon existing service curb box; 1 EA cut and cap existing 6" water main; 2 ea cut and cap existing 8" water main; 3 EA cut and cap existing 10" water main; 2 EA cut and cap existing 12" water main; 1 EA connect to existing 8" water main near 1500 S 14th. See attached file.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Close: Feb 3, 2026
Project consist of approx 1,210 LF of 12" dip watermain; 641 LF of 1" sidr 7 hdpe water service; 1,975 LF of 4" asphalt paving and restoration; 47 LF of curb and gutter; LF of sidewalk. 1 LS mobilization / bonds / insurance (10% max); 1 LS traffic control; 1 LS erosion control; 1 LS water testing and start-up (including temp. Blowoffs and/or air relief); 1 LS Montana rail link permitting and coordination; 7 EA remove and abandon existing valve and valve box; 1 EA remove and abandon existing fire hydrant; 2 EA remove and abandon existing service curb box; 1 EA cut and cap existing 6" water main; 2 ea cut and cap existing 8" water main; 3 EA cut and cap existing 10" water main; 2 EA cut and cap existing 12" water main; 1 EA connect to existing 8" water main near 1500 S 14th. See attached file.
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Project consists of water main replacement.
Posted Date
Dec 7, 2025
Due Date
Feb 13, 2026
Release: Dec 7, 2025
Close: Feb 13, 2026
Project consists of water main replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis