Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Great Falls is soliciting bids for the 9th Street NE Water Main Replacement (Office File 1848.0). The project replaces approximately 1,500 linear feet of 16‑inch water main plus additional smaller diameter mains, hydrants, service connections, ADA curb ramps, and includes asphalt mill and overlay. Bids are due to the City Clerk by 9:00 a.m. local time on February 4, 2026, with a pre‑bid meeting scheduled for January 20, 2026 at the City Engineer’s office.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnish and install; approx 1384 feet of 8, 6, and 4" diameter ductile iron water main with associated fire hydrants, valves, appurtenances, fittings and pavement restoration and other work. Includes 1283 LF Zinc Coated Ductile Iron Pipe for Water Main 8-inch CL 52 Pipe (restrained joints where called for are incidental); 1384 LF Trench excavation, backfill and compaction; 3 EA 8" MJ x 8 In. MJ Cross; 2 EA Hydrant Assembly (Includes Auxiliary 6-In MJ x FLG Gate Valve); 32 TN Temporary Surfacing (HMA not to exceed 0.10' depth); 1 LS Pavement Marking Replacement.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
Furnish and install; approx 1384 feet of 8, 6, and 4" diameter ductile iron water main with associated fire hydrants, valves, appurtenances, fittings and pavement restoration and other work. Includes 1283 LF Zinc Coated Ductile Iron Pipe for Water Main 8-inch CL 52 Pipe (restrained joints where called for are incidental); 1384 LF Trench excavation, backfill and compaction; 3 EA 8" MJ x 8 In. MJ Cross; 2 EA Hydrant Assembly (Includes Auxiliary 6-In MJ x FLG Gate Valve); 32 TN Temporary Surfacing (HMA not to exceed 0.10' depth); 1 LS Pavement Marking Replacement.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableThe City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
Posted Date
Aug 7, 2025
Due Date
Aug 7, 2026
Release: Aug 7, 2025
Close: Aug 7, 2026
The City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
Installation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Installation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis