Open RFP

Appleton - Wastwater Treatment Facility Improvements RFP

Description: Work includes New Pretreatment Building; new Swing Basin; blower building improvements, new final clarifier; rehabilitation of two existing final clarifiers; new rapid mix tank/splitter structure; rehabilitation of RAS/WAS pump station; filter building and intermediate pump station modifications; addition of chemical feed facilities; new biosolids storage tank; various architectural, mechanical, and electrical improvements; storm water protection and erosion control; clearing and grubbing; piping and pavement demolition; trenching, backfilling, and compacting; various underground piping systems; manholes and vaults; power distribution; communications; earthwork; grading; asphaltic and concrete paving; site lighting; site restoration, landscaping and seeding; and all other components as shown and described in the Drawings and Specifications.

Buyer
City of Appleton

City · MN, US

Released
Aug 12, 2026
Closes
Sep 9, 2026(15 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts