Open RFPAnnual Water Treatment Plant High Service Pump Maintenance Contractor (Request For Proposal)
Description: Work includes remove, inspect, repair, modify, test, and reinstall the vertical turbine & split case horizontal high service pumps; work shall include removal of the motor from the discharge head (electrical disconnected by city staff) and set aside in a location directed by the city staff, removal of the pump assembly, transport of pumps to a local service center, complete teardown and inspection, development of a repair quotation, completion of approved repairs, reassembly, testing, return transport, reinstallation, and final field startup/testing.