CityFL
Posted
Oct 5, 2026
Oct 29, 2026
Annual Water Treatment Plant High Service Pump Maintenance Contractor (Request For Proposal)
Work includes remove, inspect, repair, modify, test, and reinstall the vertical turbine & split case horizontal high service pumps; work shall include removal of the motor from the discharge head (electrical disconnected by city staff) and set aside in a location directed by the city staff, removal of the pump assembly, transport of pumps to a local service center, complete teardown and inspection, development of a repair quotation, completion of approved repairs, reassembly, testing, return transport, reinstallation, and final field startup/testing.
