North Dakota Oil and Gas Division
State AgencyND
Posted
Aug 22, 2026
Sep 9, 2026
Plugging of 4 Wells in McKenzie County RFP
Plugging of wells.
Description: Amistad Reservoir and Dam, Plugging of Penstock No. 4. Requires construction services to permanently plug Penstock No. 4 at Amistad Reservoir and Dam. Penstock No. 4 was designed for irrigation use and has not been operated for irrigation purposes for several decades. The work is intended to eliminate the need for continued maintenance of the Penstock and Irrigation Gates by permanently plugging the penstock and removing related gate components. The work is specialized and involves dam infrastructure, confined access areas, water control features, heavy lifting, unwatering, concrete placement, structural concrete repair, grouting, gate removal, and safety controls. The Government is seeking firms with demonstrated experience performing comparable work in similar high risk construction environments. The anticipated work includes, but is not limited to, the following: Permanent plugging of Penstock No. 4. Unwatering of Penstock No. 4. Construction of concrete plug features within dam infrastructure. Structural concrete repair associated with the penstock and dam features. Removal of penstock and irrigation gate components. Grouting and related concrete repair work. Hoisting, lifting, rigging, crane support, and use of manlift equipment. Work in confined or restricted access areas. Compliance with dam safety, construction safety, and site access requirements. Coordination with USIBWC personnel for access, work hours, security, and site controls.
Federal · TX, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
These related opportunities are still open for bidding.
North Dakota Oil and Gas Division
State AgencyND
Posted
Aug 22, 2026
Sep 9, 2026
Plugging of wells.
CityIL
Posted
Aug 28, 2026
Sep 21, 2026
Construction of the Reservoir 3 & 4 Rehabilitation project, which includes recoating the reservoir structure, replacing HMA pavement, providing temporary and permanent fencing, providing thermoplastic polyolefin (TPO) roofing, and other associated work.
FederalDC
Posted
-
Sep 9, 2026
The contractor shall furnish all labor, equipment, materials, tools, and transportation necessary to reclaim the existing orphaned oil and gas wells, as well as wellpads, access roads, flowlines, pipelines, and other assorted oilfield debris.
Special DistrictWA
Posted
Jul 22, 2026
Sep 16, 2026
The scope of work consists of two schedules of work. Schedule A consists of construction of a 65-foot diameter, 3.0-million-gallon (MG) welded steel reservoir ("1400 Reservoir"). Schedule B consist of demolition of an existing 150,000-gallon elevated steel reservoir ("1100 Reservoir"). Schedule A consists of constructing a 3.0 MG welded steel reservoir that will include a wraparound staircase, inlet, outlet, drain, and overflow piping, active mixing system, access hatches and roof vents, level gauges, sample ports, access manways, a radio communication antenna, structural and electrical provisions for addition of a cell phone antenna on top of the reservoir, and an impressed current cathodic protection system; construction of a concrete masonry unit (CMU) building to include standing seam metal roof, electrical and control equipment, cathodic protection equipment, unit heater, dehumidifier, ventilation fan, water quality monitoring equipment (chlorine, pH, and temperature), inlet and outlet piping for the reservoir; seismic elements including Flex-Tend force-balanced flexible expansion seismic joints on inlet and outlet piping and incorporation of FLO-LOC seismic control equipment to control the flow of water out of the tank following a seismic event; Supervisory Control and Data Acquisition (SCADA) panel for communication, control, monitoring, and alarms of the tank site to be incorporated into the Owner's SCADA system; connections to existing water system; paved site access to the site from 124th Avenue SE; construction of a stormwater pond, on-site stormwater drainage, and a dispersion trench for the stormwater pond; site paving, grading, lighting, and security fencing; a new on-site diesel generator; and propane tank and accessories. Schedule B consist of demolition, removal and disposal wastehaul of the Owner's existing 1100 Reservoir, piping modifications, and site restoration.
Decision makers connected to this RFP from International Boundary And Water Commission: U.S.-Mexico.