CityCA
Posted
Oct 15, 2026
Nov 24, 2026
Site Modifications At the Palmyrita Water Treatment Plant for Pfas Removal RFP
Work to be done, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct the treatment plant complete in place in accordance with the plans and specifications. The palmyrita water treatment plant site modifications for pfas removal are summarized as follows: purchase, take delivery, and install ix pressure vessel systems at the water treatment plant including pressure testing, disinfection, and bacteria testing. Purchase, coordinate and assist with the installation of ion exchange (ix) media into ix pressure vessels. Furnish and install a prefilter system for the ion exchange (ix) system. Furnish and install booster pump station. Construct structural concrete at the palmyrita water treatment plant site modifications for pfas removal; etc, see outside link.
