CityMI
Posted
-
Dec 10, 2026
WASHTENAW AVENUE WATER MAIN REPLACEMENT PROJECT RFP
Construction services to replace the water main along Washtenaw Avenue from S University Avenue to approximately 700 feet south of Tuomy Road.
Description: construction of the following Project: 2026 Water Lines Replacement Project Project includes the following Work: the furnishing of all labor, material, plant, utilities, and services required for the installation of 6", 8", 16", and 20" waterline.
SpecialDistrict · PA, US
Decision makers connected to this RFP from Moon Township Municipal Authority.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityMI
Posted
-
Dec 10, 2026
Construction services to replace the water main along Washtenaw Avenue from S University Avenue to approximately 700 feet south of Tuomy Road.
CityIA
Posted
Nov 3, 2026
Dec 17, 2026
Work includes approx. 333 CY of excavation; 1,424 LF of 16" DI water main; 330 LF of 16" DI trenchless water main directional drill; 391 LF of 16" DI trenchless water main installed in 24" steel casing; 10 LF of 1" copper water service pipe; 1 EA of water service abandonment; 440 LF of 12" water main abandonment pipe 20" casing; 27 SY of 9" PCC pavement C-SUD or C-SUDHW; 45 SY of 2" HMA pavement; 133 SY of 6" sidewalk PCC.
CityKS
Posted
Nov 13, 2026
Dec 11, 2026
The City of Wichita is seeking bids from firm(s) to provide construction services for the Public Works & Utilties Department.
CountyVA
Posted
Aug 14, 2025
Nov 21, 2026
The project is generally described as removal of the existing Single-Ply Membrane Roof System and replacement with a new Fully-Adhered EPDM Roof System (approximately 8,660 SF.)