FederalNM
Jul 31, 2026
Closes
Sep 1, 2026
Building 1055 Chiller Replacement
The removal and replacement of the existing chiller to include new piping, valves, electrical, and a complete flush and fill of the hydronic system at Building 1055, 2251.
Description: Ypsilanti Community Utilities Authority is soliciting bids for installation of a new chiller and boiler for the HVAC system at its Administration Building in Ypsilanti, Michigan. The contract work is scheduled to commence following the bid opening on September 11, 2026, and will be performed at 2777 State Road, Ypsilanti, Michigan. Bids are due September 11, 2026, at 2:00 p.m. EDT.
SpecialDistrict · MI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
FederalNM
Jul 31, 2026
Closes
Sep 1, 2026
The removal and replacement of the existing chiller to include new piping, valves, electrical, and a complete flush and fill of the hydronic system at Building 1055, 2251.
CityFL
Aug 1, 2026
Closes
Sep 15, 2026
Design, supply, and installation of a complete working prepackaged chiller building (pcb) with all mep components and connected with site utilities and services.
CountyFL
Jun 29, 2026
Closes
Sep 1, 2026
Work includes HVAC chiller plant upgrades.
CityCO
Aug 7, 2026
Closes
Aug 31, 2026
Removal and installation of new chiller unit at public safety building. SCOPE OF WORK: Contractor shall secure all necessary permits. Provide all labor and materials required to replace the existing Chiller with the new unit. Remove and properly dispose of the existing Chiller. The new Chiller shall be supplied by the City. New Chiller should be a like-for-like replacement should fit the existing curb. Contractor is responsible for the electrical disconnection of the existing unit and the electrical connection of the new unit. Contractor is responsible for disconnecting and reconnecting the controls wiring from the chiller to the building. See outside link.
Decision makers connected to this RFP from Ypsilanti Community Utilities Authority.