Removal and Installation of New Chiller Unit at Public Safety Building RFP
Aug 7, 2026
Closes
Aug 31, 2026
Removal and installation of new chiller unit at public safety building. SCOPE OF WORK: Contractor shall secure all necessary permits. Provide all labor and materials required to replace the existing Chiller with the new unit. Remove and properly dispose of the existing Chiller. The new Chiller shall be supplied by the City. New Chiller should be a like-for-like replacement should fit the existing curb. Contractor is responsible for the electrical disconnection of the existing unit and the electrical connection of the new unit. Contractor is responsible for disconnecting and reconnecting the controls wiring from the chiller to the building. See outside link.