Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide site improvements for (3) 24'x40' modular building & (1) 12'x40' modular restroom. work to include but not necessarily limited to demo of existing grade, & existing underground utilities as required, cut and cap existing irrigation lines outside the limits of construction, salvage irrigation heads/ valves & return to district. provide and install site grading, concrete flatwork, relocate utilities, galv. flashing, fire extinguisher, signage, trenching, underground conduits & connecting all power, signal, fire alarm, grounds & all required utility services hook-ups to the modular building, the contractor shall coordinate w/ modular building supplier for a complete and functional installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide site improvements for (2) 24'x40' modular building & (1) 12'x40' modular restroom. Work to include demo of existing grade, & existing underground utilities as required, cut and cap existing irrigation lines outside the limits of construction, salvage irrigation heads/ valves & return to district. Provide and install site grading, concrete flatwork, relocate utilities, galv. Flashing, fire extinguisher, signage, trenching, underground conduits & connecting all power, signal, fire alarm, grounds & all required utility services.
Posted Date
Dec 23, 2025
Due Date
Jan 21, 2026
Release: Dec 23, 2025
Close: Jan 21, 2026
Provide site improvements for (2) 24'x40' modular building & (1) 12'x40' modular restroom. Work to include demo of existing grade, & existing underground utilities as required, cut and cap existing irrigation lines outside the limits of construction, salvage irrigation heads/ valves & return to district. Provide and install site grading, concrete flatwork, relocate utilities, galv. Flashing, fire extinguisher, signage, trenching, underground conduits & connecting all power, signal, fire alarm, grounds & all required utility services.
AvailableWork includes frost wall foundation excavation and backfill 5 ea, crawl space rigid foam board and radon pipe 2800 sf, 6' concrete porch piers 15 ea, crane support (gravel pads and tempoary roadway) 1 ls, rock excavation 10 cy, boulder excavation 25 cy, stone embankment-in-place 100 cy, exploratory excavation 3 ea, common fill 500 cy, fine crushed stone (nhdot 304. 4) 150 cy, coarse crushed stone (nhdot 304. 5) 250 cy, sawed bituminous pavement 30 lf, hbp-3/4" binder mix, machine method 80 ton, hbp-1/2" surface mix, machine method 60 ton, pavement joint adhesive 500 lf, asphalt emulsion for tack coat 50 gal.
Posted Date
Jan 7, 2026
Due Date
Jan 20, 2026
Release: Jan 7, 2026
Close: Jan 20, 2026
Work includes frost wall foundation excavation and backfill 5 ea, crawl space rigid foam board and radon pipe 2800 sf, 6' concrete porch piers 15 ea, crane support (gravel pads and tempoary roadway) 1 ls, rock excavation 10 cy, boulder excavation 25 cy, stone embankment-in-place 100 cy, exploratory excavation 3 ea, common fill 500 cy, fine crushed stone (nhdot 304. 4) 150 cy, coarse crushed stone (nhdot 304. 5) 250 cy, sawed bituminous pavement 30 lf, hbp-3/4" binder mix, machine method 80 ton, hbp-1/2" surface mix, machine method 60 ton, pavement joint adhesive 500 lf, asphalt emulsion for tack coat 50 gal.
Release: Dec 29, 2025
Close: Jan 22, 2026
One stop restroom renovations phase 1.
AvailableConstruct all site work, foundation and new building for the one (1) new modular classroom building at middle school.
Posted Date
Dec 26, 2025
Due Date
Jan 20, 2026
Release: Dec 26, 2025
Close: Jan 20, 2026
Construct all site work, foundation and new building for the one (1) new modular classroom building at middle school.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis