Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes frost wall foundation excavation and backfill 5 ea, crawl space rigid foam board and radon pipe 2800 sf, 6' concrete porch piers 15 ea, crane support (gravel pads and tempoary roadway) 1 ls, rock excavation 10 cy, boulder excavation 25 cy, stone embankment-in-place 100 cy, exploratory excavation 3 ea, common fill 500 cy, fine crushed stone (nhdot 304. 4) 150 cy, coarse crushed stone (nhdot 304. 5) 250 cy, sawed bituminous pavement 30 lf, hbp-3/4" binder mix, machine method 80 ton, hbp-1/2" surface mix, machine method 60 ton, pavement joint adhesive 500 lf, asphalt emulsion for tack coat 50 gal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Completing the site work for a new playground.
Posted Date
Dec 25, 2025
Due Date
Jan 29, 2026
Release: Dec 25, 2025
Close: Jan 29, 2026
Completing the site work for a new playground.
AvailableProvide job order contracting (JOC) services for site-work trade.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
Provide job order contracting (JOC) services for site-work trade.
AvailableDemolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. The demolition and removal of storm sewer networks consist of approx. 201 LF of pipe and 3 structures. The installation of proposed storm sewer networks consists of approx. 1,900 LF of pipe, and 27 structures. The demolition and removal of sanitary sewer networks consist of approx. 1,207 LF of pipe and 4 structures. The installation of sanitary sewer networks consists of approx. 1,343 LF of pipe and 10 structures. The installation of public water main consists of approximately 1633 LF of pipe, 4 fire hydrants, and 56 water service lines and meters. Erosion, Sedimentation and Pollution control measures must be implemented, maintained, and removed post-installation.
Posted Date
Nov 21, 2025
Due Date
Jan 29, 2026
Release: Nov 21, 2025
Close: Jan 29, 2026
Provide site improvements for (3) 24'x40' modular building & (1) 12'x40' modular restroom. work to include but not necessarily limited to demo of existing grade, & existing underground utilities as required, cut and cap existing irrigation lines outside the limits of construction, salvage irrigation heads/ valves & return to district. provide and install site grading, concrete flatwork, relocate utilities, galv. flashing, fire extinguisher, signage, trenching, underground conduits & connecting all power, signal, fire alarm, grounds & all required utility services hook-ups to the modular building, the contractor shall coordinate w/ modular building supplier for a complete and functional installation.
Posted Date
Nov 5, 2025
Due Date
Jan 14, 2026
Release: Nov 5, 2025
Close: Jan 14, 2026
Provide site improvements for (3) 24'x40' modular building & (1) 12'x40' modular restroom. work to include but not necessarily limited to demo of existing grade, & existing underground utilities as required, cut and cap existing irrigation lines outside the limits of construction, salvage irrigation heads/ valves & return to district. provide and install site grading, concrete flatwork, relocate utilities, galv. flashing, fire extinguisher, signage, trenching, underground conduits & connecting all power, signal, fire alarm, grounds & all required utility services hook-ups to the modular building, the contractor shall coordinate w/ modular building supplier for a complete and functional installation.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition and removal of existing public sewer main and storm drainage networks, and the proposed improvements include storm sewer, sanitary sewer, and water utility infrastructure. The demolition and removal of storm sewer networks consist of approx. 201 LF of pipe and 3 structures. The installation of proposed storm sewer networks consists of approx. 1,900 LF of pipe, and 27 structures. The demolition and removal of sanitary sewer networks consist of approx. 1,207 LF of pipe and 4 structures. The installation of sanitary sewer networks consists of approx. 1,343 LF of pipe and 10 structures. The installation of public water main consists of approximately 1633 LF of pipe, 4 fire hydrants, and 56 water service lines and meters. Erosion, Sedimentation and Pollution control measures must be implemented, maintained, and removed post-installation.
Available