Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Solicit quotes to furnish and install replacement equipment for the CL2 chemical feed system and associated electrical rework, including programming and start-up.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide WWTP air header replacement. Project consists of removing and replacing approx. 215 LF of existing 18" ductile iron pipe, fittings and appurtenances on an existing wastewater treatment plant air blower system, along with approx. 20 LF of 12" ductile iron pipe, fittings and two 12" butterfly valves. Contractor shall also restore concrete pavement disturbed by construction, expand existing concrete driveway, and recoat existing ductile iron pipe air header.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Provide WWTP air header replacement. Project consists of removing and replacing approx. 215 LF of existing 18" ductile iron pipe, fittings and appurtenances on an existing wastewater treatment plant air blower system, along with approx. 20 LF of 12" ductile iron pipe, fittings and two 12" butterfly valves. Contractor shall also restore concrete pavement disturbed by construction, expand existing concrete driveway, and recoat existing ductile iron pipe air header.
Premium
Access the largest public sector contact database
Seeks for primary clarifier improvements - center feed clarifier equipment procurement.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Seeks for primary clarifier improvements - center feed clarifier equipment procurement.
AvailableWork includes removal of existing sodium hypochlorite storage tanks, feed pump skids, recirculation pump, associated electrical connections, piping, valves and supports, furnish and install temporary sodium hypochlorite storage and feed to avoid operational interruptions at the facility, furnish and install the new specified sodium hypochlorite storage tanks, pump skid, recirculation pump, tank fill dilution panel, potable water backflow, associated piping, valves and appurtenances, associated electrical and instrumentation work for the new equipment to be installed, containment area and metal building coatings.
Posted Date
Oct 20, 2025
Due Date
Dec 17, 2025
Release: Oct 20, 2025
Close: Dec 17, 2025
Work includes removal of existing sodium hypochlorite storage tanks, feed pump skids, recirculation pump, associated electrical connections, piping, valves and supports, furnish and install temporary sodium hypochlorite storage and feed to avoid operational interruptions at the facility, furnish and install the new specified sodium hypochlorite storage tanks, pump skid, recirculation pump, tank fill dilution panel, potable water backflow, associated piping, valves and appurtenances, associated electrical and instrumentation work for the new equipment to be installed, containment area and metal building coatings.
AvailableWork includes approx. 14' DIA of aeration digester w/ decanter, chemical feed building and equipment, decant pumps, blower motors, electrical, piping, and site work for a fully functioning system as shown in the plans and specifications. See outside link for more details.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Work includes approx. 14' DIA of aeration digester w/ decanter, chemical feed building and equipment, decant pumps, blower motors, electrical, piping, and site work for a fully functioning system as shown in the plans and specifications. See outside link for more details.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.