Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Charlotte Water is soliciting bids for the construction of a ferric chloride chemical feed system at the Irwin Creek Water Reclamation Facility. The project includes installing new chemical storage containment, a storage tank, pump skid, and process piping to dose ferric chloride to existing sludge feed pipes. This construction solicitation is an Invitation to Bid (ITB) with submissions due by February 19, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Chemical Feed Pump Parts.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Close: Feb 10, 2026
Chemical Feed Pump Parts.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish & installation of a new Hydrous Manganese Oxide (HMO) chemical feed system located within the existing Shorrock Street Water Treatment Plant. The work will include but is not limited to the demolition and preparation required, installation of a new containment curb, FRP grating system, chemical tote load cell devices, HDPE batch tanks, chemical transfer pumps, chemical metering pumps, all associated suction and discharge piping, valving and appurtenances, emergency safety shower, all instrumentation and control equipment and features, electrical modifications, HVAC modifications, fire protection system modifications, and plumbing modifications necessary for a complete working chemical feed system. Demolition of, and modifications to, the existing packed column aeration system at the Shorrock Street Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility. Demolition of, and modifications to, the existing packed column aerator system at the New Hampshire Avenue Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility.
Posted Date
Jan 15, 2026
Due Date
Feb 25, 2026
Release: Jan 15, 2026
Close: Feb 25, 2026
Furnish & installation of a new Hydrous Manganese Oxide (HMO) chemical feed system located within the existing Shorrock Street Water Treatment Plant. The work will include but is not limited to the demolition and preparation required, installation of a new containment curb, FRP grating system, chemical tote load cell devices, HDPE batch tanks, chemical transfer pumps, chemical metering pumps, all associated suction and discharge piping, valving and appurtenances, emergency safety shower, all instrumentation and control equipment and features, electrical modifications, HVAC modifications, fire protection system modifications, and plumbing modifications necessary for a complete working chemical feed system. Demolition of, and modifications to, the existing packed column aeration system at the Shorrock Street Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility. Demolition of, and modifications to, the existing packed column aerator system at the New Hampshire Avenue Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility.
AvailableSupply and delivery of ferric chloride.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
Supply and delivery of ferric chloride.
AvailableAdd las feed at both plants and modify existing chemical feed systems.
Posted Date
Jan 15, 2026
Due Date
Feb 18, 2026
Release: Jan 15, 2026
Close: Feb 18, 2026
Add las feed at both plants and modify existing chemical feed systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.