Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish & installation of a new Hydrous Manganese Oxide (HMO) chemical feed system located within the existing Shorrock Street Water Treatment Plant. The work will include but is not limited to the demolition and preparation required, installation of a new containment curb, FRP grating system, chemical tote load cell devices, HDPE batch tanks, chemical transfer pumps, chemical metering pumps, all associated suction and discharge piping, valving and appurtenances, emergency safety shower, all instrumentation and control equipment and features, electrical modifications, HVAC modifications, fire protection system modifications, and plumbing modifications necessary for a complete working chemical feed system. Demolition of, and modifications to, the existing packed column aeration system at the Shorrock Street Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility. Demolition of, and modifications to, the existing packed column aerator system at the New Hampshire Avenue Water Treatment Plant. This work will include but is not limited to selective demolition of aerator unit, piping, blowers and ductwork, followed by installation of new ductile iron piping, valving and heat trace to maintain flow through the facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of a chemical feed system, sodium thiosulfate, for wastewater effluent dechlorination. Installing underground chemical feed piping and tubing. Installation of open-channel flow measurement instrumentation and metal v-notch weirs. Electrical improvements related thereto. SCADA integration. Restoration of disturbed areas.
Posted Date
Jan 2, 2026
Due Date
Jan 27, 2026
Release: Jan 2, 2026
Close: Jan 27, 2026
Installation of a chemical feed system, sodium thiosulfate, for wastewater effluent dechlorination. Installing underground chemical feed piping and tubing. Installation of open-channel flow measurement instrumentation and metal v-notch weirs. Electrical improvements related thereto. SCADA integration. Restoration of disturbed areas.
AvailableWater Treatment Plant Improvements including controls, process and chemical room upgrades, well improvements, and other miscellaneous items.
Posted Date
Jan 12, 2026
Due Date
Feb 5, 2026
Release: Jan 12, 2026
Close: Feb 5, 2026
Water Treatment Plant Improvements including controls, process and chemical room upgrades, well improvements, and other miscellaneous items.
AvailableImprovements to the Water Treatment Plant (WTP) for the Borough.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Improvements to the Water Treatment Plant (WTP) for the Borough.
AvailableThe Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
Posted Date
Jan 23, 2026
Due Date
Apr 22, 2026
Release: Jan 23, 2026
Close: Apr 22, 2026
The Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis