Special DistrictWA
Posted
-
Dec 16, 2026
Bellevue Issaquah Pipeline Relocation At Lewis Creek RFP
The Bellevue-Issaquah Pipeline (BIP) Relocation at Lewis Creek Project consists of relocating a portion of Cascade Water Alliance's existing 24" diameter, high-pressure ductile iron water transmission main that conflicts with Washington State Department of Transportation (WSDOT) improvements at Lewis Creek near I-90 and SE Newport Way. The BIP is a critical regional transmission facility operating at pressures exceeding 200 psi, and continuity of water service is a key requirement during construction. The Work generally includes installation of approx. 300 LF of new 24" ductile iron water main; installation of portions of the new main within 36" steel casing, including a casing suspended beneath the proposed bridge; construction and operation of a temporary 16" HDPE bypass; installation of insertion valves, tapping sleeves, valves, Flex-Tend fittings, and appurtenances; connections to the existing BIP; abandonment of portions of the existing pipeline; and associated excavation, backfill, surface restoration, traffic control, testing, disinfection, and related work. Construction must be closely coordinated with WSDOT and its design-build contractor, Atkinson, because the pipeline relocation occurs within the limits of the WSDOT I-90 Fish Passage Project and WSDOT right-of-way.
