Avenue M New Entrance Road & Stormwater Pipeline Relocation at Harbour Pointe RFP
Work includes new entrance road & stormwater pipeline relocation.
Description: The Bellevue-Issaquah Pipeline (BIP) Relocation at Lewis Creek Project consists of relocating a portion of Cascade Water Alliance's existing 24" diameter, high-pressure ductile iron water transmission main that conflicts with Washington State Department of Transportation (WSDOT) improvements at Lewis Creek near I-90 and SE Newport Way. The BIP is a critical regional transmission facility operating at pressures exceeding 200 psi, and continuity of water service is a key requirement during construction. The Work generally includes installation of approx. 300 LF of new 24" ductile iron water main; installation of portions of the new main within 36" steel casing, including a casing suspended beneath the proposed bridge; construction and operation of a temporary 16" HDPE bypass; installation of insertion valves, tapping sleeves, valves, Flex-Tend fittings, and appurtenances; connections to the existing BIP; abandonment of portions of the existing pipeline; and associated excavation, backfill, surface restoration, traffic control, testing, disinfection, and related work. Construction must be closely coordinated with WSDOT and its design-build contractor, Atkinson, because the pipeline relocation occurs within the limits of the WSDOT I-90 Fish Passage Project and WSDOT right-of-way.
SpecialDistrict · WA, US
Adjacent opportunities open for bidding right now.
CountyFL
Posted
Oct 4, 2026
Dec 2, 2026
Work includes new entrance road & stormwater pipeline relocation.
San Francisco Public Utilities Commission
Special DistrictCA
Posted
Nov 17, 2026
Dec 17, 2026
Construction contract to repair erosion around the Sunset Supply Pipeline at San Mateo Creek by installing soldier beams and lagging concrete retaining walls along the creek bank. The scope includes placement of engineered backfill, installation of bioengineered creek embankment restoration, and improvements to an existing access road along the pipeline. Work will be performed in San Mateo County, California with an estimated construction cost of $2,700,000–$3,000,000 and includes Local Business Enterprise subcontracting requirements.
Special DistrictCA
Posted
Nov 20, 2026
Dec 11, 2026
For more details on the project, please refer to the Specifications and Exhibit A in the Documents section. The project generally consists of sliplining an existing 30-inch CML&C water main in the City if Chula Vista with ±3,580 LF of 24-inch HDPE pipe, spanning from Second Avenue at the northern edge of the San Diego Country Club to the southern edge, then east along Moss to the intersection of Naples Street and First Avenue. The project also includes the abandonment of existing pipelines and appurtenances of various materials and diameters, and the installation of new pipe, appurtenances, and service laterals of various materials and diameters. All forms are required, and must be completed and submitted with the Bid Line Items. The successful Bidder will be required to furnish the Authority with a Performance Bond equal to 100% of the successful Bid, and a Payment Bond equal to 100% of the successful Bid, prior to execution of the Contract. For information regarding this Notice, contact Michelle Musgrave, Office Assistant Supervisor, at mmusgrave@sweetwater.org.
CityTX
Posted
Nov 16, 2026
Jan 7, 2027
The work consists of pipeline renewal of approx. 2,166 LF of 8" wastewater line 15" wastewater line and 465 LF of 8" waterline.
Decision makers connected to this RFP from Cascade Water Alliance.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
Cascade’s Board of Directors authorized its Chief Executive Officer to execute a WSDOT utility construction agreement for bridge-reinforcement design and coordination supporting the BIP relocation at Lewis Creek.
7. CONSENT ITEM A. Board Meeting Minutes for July 23, 2025. B. Motion to authorize the Chief Executive Officer to execute a Utility Construction Agreement with Washington State Department of Transportation to provide bridge reinforcement design and coordination services in support of relocation of the Bellevue-Issaquah Pipeline at Lewis Creek, in an amount…
Board of Directors Meeting Minutes
Board meeting · Sep 24, 2025
Agenda packet
Cascade reported that the Lewis Creek BIP relocation was progressing through final design, franchise amendment review, SEPA determination, and local permitting.
• The Bellevue-Issaquah Pipeline Relocation at Lewis Creek project is currently progressing to final design. Washington State Department of Transportation (WSDOT) is in final review of the franchise application amendment/variances. Cascade is finalizing the State Environmental Policy Act (SEPA) determination and other applicable local permitting.
Cascade Water Alliance Regular Meeting
Agenda packet · Jul 22, 2026
Capital improvement plan
Cascade's adopted 2027–2032 Capital Improvement Plan includes $2.6 million for BIP in 2027.
Adopted 2027-2032 Capital Improvement Plan Budget by Program Area Program Area 2027 2028 2029 2030 2031 2032 Upper Conveyance $800,000 $1,600,000 $1,350,000 $1,200,000 $240,000 $250,000 Lower Conveyance 2,200,000 1,770,000 2,110,000 1,650,000 1,190,000 1,230,000 Lake Tapps Reservoir 260,000 270,000 280,000 290,000 300,000 310,000 Facilities 100,000 110,000…
Cascade Water Alliance Capital Improvement Plan 2027-2032
Capital improvement plan · Sep 23, 2026
Agenda packet
Cascade reported final design completion and WSDOT franchise approval, with construction-bid advertisement planned for mid-November and bid opening for mid-December.
Due to the relocation to a new location within WSDOT's right-of-way, Cascade's franchise agreement with WSDOT is required to be amended after the final design. Cascade's consultant, Stantec, completed final design in August, and Cascade sent the franchise amendment package to WSDOT for their approval. Cascade received WSDOT's approval on October 14 and is…
Cascade Water Alliance Board of Directors Special Meeting
Agenda packet · Nov 16, 2026
RFP published
Proposals due (24 days left)
Total Contract Cost: This contract will include capital expenditure anticipated under line item 310 of the adopted 2025-2026 CIP budget. The budget includes $2,600,000 for 2027, with anticipated expenditures of approximately $2,540,000 total for this construction contract. Approved in Current Biennial Budget: ☒ Yes ☐ No ☐ N/A Budget Line 2027 Capital Budget…
Cascade Water Alliance Board of Directors Special Meeting
Agenda packet · Nov 16, 2026