Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sweetwater Authority
Sweetwater Authority is soliciting qualifications for an on-call SCADA (Supervisory Control and Data Acquisition) System Integrator to provide annual maintenance support and perform system modifications related to capital improvement projects. Submissions are electronic through the agency's vendor portal; a remote pre-bid meeting is scheduled for 2026-04-07 at 1:00 PM PDT and the Q&A deadline is 2026-04-16 at 1:00 PM PDT. Proposals are due 2026-04-28 at 3:00 PM PDT.
Posted Date
Mar 16, 2026
Due Date
Apr 28, 2026
Release: Mar 16, 2026
Sweetwater Authority
Close: Apr 28, 2026
Sweetwater Authority is soliciting qualifications for an on-call SCADA (Supervisory Control and Data Acquisition) System Integrator to provide annual maintenance support and perform system modifications related to capital improvement projects. Submissions are electronic through the agency's vendor portal; a remote pre-bid meeting is scheduled for 2026-04-07 at 1:00 PM PDT and the Q&A deadline is 2026-04-16 at 1:00 PM PDT. Proposals are due 2026-04-28 at 3:00 PM PDT.
AvailableSweetwater Authority
Provide professional engineering firms with specialized expertise in hydrogeology and well siting particularly knowledge of the formation, well siting, and field hydrology studies to prepare a well siting study to locate five new wells, and prepare drawings and specifications for a zone sample well. Task 1: data collection, review, and project coordination the consultant shall initiate the project by coordinating with the authority to establish communication protocols, confirm project expectations, and collect all available well and san diego formation information. ; task 2: well siting study technical memorandum based on the data and documents reviewed under task 1, the consultant shall first conduct a desktop analysis, and then perform a field review of the top 10 candidate sites to identify suitable locations for five proposed wells.
Posted Date
Mar 13, 2026
Due Date
Apr 17, 2026
Release: Mar 13, 2026
Sweetwater Authority
Close: Apr 17, 2026
Provide professional engineering firms with specialized expertise in hydrogeology and well siting particularly knowledge of the formation, well siting, and field hydrology studies to prepare a well siting study to locate five new wells, and prepare drawings and specifications for a zone sample well. Task 1: data collection, review, and project coordination the consultant shall initiate the project by coordinating with the authority to establish communication protocols, confirm project expectations, and collect all available well and san diego formation information. ; task 2: well siting study technical memorandum based on the data and documents reviewed under task 1, the consultant shall first conduct a desktop analysis, and then perform a field review of the top 10 candidate sites to identify suitable locations for five proposed wells.
AvailableSweetwater Authority
Seeking qualified contractors to removal and replacement of 2 (two) hvac package units, and removal and replacement of 4 (four) split system heat pump condensing units, 4 (four) heat pump fan coil units.
Posted Date
Mar 2, 2026
Due Date
Mar 26, 2026
Release: Mar 2, 2026
Sweetwater Authority
Close: Mar 26, 2026
Seeking qualified contractors to removal and replacement of 2 (two) hvac package units, and removal and replacement of 4 (four) split system heat pump condensing units, 4 (four) heat pump fan coil units.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Sweetwater Authority
The proposed Property Operations and Maintenance Plan aims to streamline permitting processes through a programmatic approach, covering various operational activities and selected projects. Key focus areas include the maintenance of defensible space, field facilities, roads, trails, recreation facilities, water transfers, and lake and dam infrastructure, alongside new projects such as dam and dike improvements, reservoir capacity recovery, and the installation of new water distribution and monitoring facilities. This plan seeks to obtain programmatic permits by 2028, thereby enhancing operational efficiency and ensuring long-term regulatory compliance.
The meeting, designated as Meeting #14, served as a Continued PFAS Education Workshop. Key discussion points included an overview of the Sweetwater Authority's operations and water sources, a detailed explanation of what PFAS are and where they are found, and a review of current and upcoming Environmental Protection Agency (EPA) regulations regarding PFAS in drinking water, including response and notification levels. The agenda also covered recent PFAS testing results from January 2025 for specific compounds like PFOA and PFHxS, potential long-term solutions requiring infrastructure investment, and community outreach efforts, including future workshop schedules.
Key discussions focused on increasing outreach for water conservation rebates, including feedback on the distribution map, suggestions for enhancing it with director division layers and color-coding for targeted marketing. Further discussion involved flow monitors, including installation methods and potential future rebates to minimize device costs, tankless water heaters (new vs. retrofit systems), and graywater systems (configurations and installation cost reduction suggestions). Updates were provided on the Floating Solar Project, noting the addition of preliminary photo simulations to the webpage. Additionally, the Authority is considering an addendum to the Environmental Impact Report for the Sweetwater Reservoir Recreational Facilities Master Plan, specifically concerning the conversion of a maintenance road into a shared maintenance road and trail. Other topics included questions about a well siting study in National City, a suggestion comparing floating versus ground-mounted solar, discussion of additional water resources like desalination and potable reuse, and a suggestion to extend Loveland Reservoir Recreation Program hours.
The meeting of the Community Advisory Work Group focused primarily on the Reynolds Desalination Facility's Floating Solar Project at Sweetwater Reservoir. Key discussion points included a presentation on the project scope, which involves a rectangular floating photovoltaic array, anchoring systems, and supporting land facilities, totaling approximately 10 acres. An alternative based on Noria's Aquaphi technology will also be analyzed. An environmental process update indicated that technical assessments (biological, aquatic resources, water quality, aesthetics) are commencing to inform a CEQA-compliant Initial Study, which will determine whether a Mitigated Negative Declaration or an Environmental Impact Report is necessary. Discussion and Q&A revealed community concerns regarding panel aesthetics, requests for project renderings, comparison of floating vs. land solar benefits, questions about panel materials (HDPE longevity and off-gassing), panel cleaning procedures, potential impacts on water quality (including mitigation of algae blooms), and requests for project cost information.
The meeting focused primarily on providing general information about the Community Advisory Work Group (CAWG) and a detailed discussion regarding the process and recommendations for connecting water service to proposed Accessory Dwelling Units (ADUs). Key technical discussions included pressure reducing valve (PRV) requirements, determining appropriate pipe sizing for ADUs based on plumbing code, clarification that sewer service is handled by respective cities or agencies, and inquiries regarding submetering and the criteria required for selling ADUs (including utility metering). Additionally, attendees discussed an electric vehicles report, recommending the installation of a vehicle charging station at the Perdue Water Treatment Facility, and raised questions about the Loveland Reservoir Recreation Program hours.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Sweetwater Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database