Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes replace approx. 935 feet of 6" water line, including three fire hydrants and 19 service connections. Mill and resurface the full width of 2nd street with 2" of surface course asphalt. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water Service Line Replacement Project.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
Water Service Line Replacement Project.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of water main replacement.
Posted Date
Dec 7, 2025
Due Date
Feb 13, 2026
Release: Dec 7, 2025
Close: Feb 13, 2026
Project consists of water main replacement.
AvailableWater main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
AvailableProject consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 29, 2026
Release: Dec 3, 2025
Close: Jan 29, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.