Iowa Department of Administrative Services
State AgencyIA
Posted
Nov 10, 2026
Dec 10, 2026
26-14 Sto822305D (Story) RFP
Constructed nutrient reduction wetland
Description: In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 36,170 total cubic yards of earthwork, 1,469 linear feet of pipe installation, 43 tons of riprap, installation of a Modified SW-513 concrete outlet structure, SW-402 pump basin, solar pump system and 11.5 acres of seeding. The estimated construction cost range for this project is $240,000 to $360,000.
StateAgency · IA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Iowa Department of Administrative Services
State AgencyIA
Posted
Nov 10, 2026
Dec 10, 2026
Constructed nutrient reduction wetland
CityMI
Posted
Nov 9, 2026
Dec 2, 2026
The Charter Township of Brighton is seeking proposals for services related to sanitary sewer repairs and grinder pump installation. The work includes grinder pump station installations and emergency repairs to the sanitary sewer system. The stated work term is January 1 through December 31, 2027.
The University Of Tennessee Martin
Higher EducationTN
Posted
-
Nov 25, 2026
Upgrade classrooms in multiple buildings including new fixtures, finishes, lighting, building systems, abatement, and all related work to complete the project.
The University Of Tennessee System
Higher EducationTN
Posted
Nov 11, 2026
Nov 25, 2026
Design services are being procured to modify and modernize classrooms in multiple campus buildings (Alumni Memorial, Academic Resources, Dabney Hall, and Hodges Library), including selective demolition, new fixtures and finishes, lighting and controls, MEP upgrades, abatement, fire suppression rework, and required AV and FF&E. The work may be delivered as multiple subprojects with individual estimated bid targets and requires coordination with UTK Facilities Services and compliance with UTK design and construction guidelines. The procurement seeks a designer team with all required disciplines and anticipated consultants (data/AV, geotechnical, hazardous materials testing, etc.), with negotiations for additional consultant fees after designer selection.
Decision makers connected to this RFP from Iowa Department of Agriculture and Land Stewardship.