Iowa Department of Agriculture and Land Stewardship
State AgencyIA
Posted
Nov 10, 2026
Dec 10, 2026
26-14 Sto822305D (Story)
In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 36,170 total cubic yards of earthwork, 1,469 linear feet of pipe installation, 43 tons of riprap, installation of a Modified SW-513 concrete outlet structure, SW-402 pump basin, solar pump system and 11.5 acres of seeding. The estimated construction cost range for this project is $240,000 to $360,000.