CountyHI
Posted
Aug 12, 2026
Sep 17, 2026
Piilani Highway Slope Stabilization at Nuanualoa Gulch MP36.5
Project consists of repair of a damaged roadway section and slope embankment, including pavement reconstruction, rock slope scaling, reinforced shotcrete slope with grouted soil nails, and erosion control measures.