CityTX
Posted
Aug 19, 2026
Sep 17, 2026
PW Exposition Way Slope Stabilization Project
The major work will consist of the (approx. ) following: 992 SY slope stabilization; 1363 LF 6" pipe subdrain, type 8; 8550 SY 7" concrete pavement removal and replacement; 135 LF stacked stone wall grout repair; 30 LF stacked masonry stone wall removal and replacement (4' to 8' height).