Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed, and another 1,000 LF of 8-inch main will be added. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of drilling 2 test wells, 6". Drilling 3 pws wells, 12". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 5 test wells, 6". Drilling 6 pws wells, 8". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 3 test wells, 6" drilling 4 pws wells, 10" development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration.
Posted Date
Jan 19, 2026
Due Date
Feb 10, 2026
Release: Jan 19, 2026
Close: Feb 10, 2026
Project consists of drilling 2 test wells, 6". Drilling 3 pws wells, 12". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 5 test wells, 6". Drilling 6 pws wells, 8". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 3 test wells, 6" drilling 4 pws wells, 10" development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration.
AvailableProject consists of drilling 2 test wells, 6". Drilling 3 pws wells, 12". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 5 test wells, 6". Drilling 6 pws wells, 8". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 3 test wells, 6" drilling 4 pws wells, 10" development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration.
Posted Date
Jan 19, 2026
Due Date
Feb 10, 2026
Release: Jan 19, 2026
Close: Feb 10, 2026
Project consists of drilling 2 test wells, 6". Drilling 3 pws wells, 12". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 5 test wells, 6". Drilling 6 pws wells, 8". Development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration; drilling 3 test wells, 6" drilling 4 pws wells, 10" development, pump testing, disinfection and video inspection of pws wells. Site security, cleanup, and site restoration.
Construct the Modernization Improvements at the WTP Phase II - Vertical Well 2-5 replacement project. The work includes Demolition and abandonment of existing Vertical Wells 2 - 5 as indicated and necessary for the construction of the project including the removal of the vertical well structures, vaults, and associated piping and abandonment of the wells in accordance with MDNR. Installation of the new replacement Vertical Wells 2R - 5R as indicated for construction of the project.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Construct the Modernization Improvements at the WTP Phase II - Vertical Well 2-5 replacement project. The work includes Demolition and abandonment of existing Vertical Wells 2 - 5 as indicated and necessary for the construction of the project including the removal of the vertical well structures, vaults, and associated piping and abandonment of the wells in accordance with MDNR. Installation of the new replacement Vertical Wells 2R - 5R as indicated for construction of the project.
Requirement to provide environmental remediation services for the groundwater pump and treatment system operation and semi-annual groundwater monitoring services.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
Requirement to provide environmental remediation services for the groundwater pump and treatment system operation and semi-annual groundwater monitoring services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis