Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
W6QK Army Contracting Command (ACC) Apg Natick
Shipboard isolation systems.
Posted Date
Mar 11, 2026
Due Date
Apr 1, 2026
Release: Mar 11, 2026
W6QK Army Contracting Command (ACC) Apg Natick
Close: Apr 1, 2026
Shipboard isolation systems.
AvailableW6QK Army Contracting Command (ACC) Apg Natick
Preventive Maintenance: The Contractor shall perform preventive maintenance in accordance with manufacturer guidelines. Monthly preventive maintenance visits shall be conducted unless otherwise directed. Calibration: Calibration shall be performed every six (6) months for specified equipment and annually where applicable. All calibrations shall be traceable to NIST standards and documented. Response Time: Contractor shall respond to service calls within 48 hours during normal business days. See attached file.
Posted Date
Mar 5, 2026
Due Date
Mar 20, 2026
Release: Mar 5, 2026
W6QK Army Contracting Command (ACC) Apg Natick
Close: Mar 20, 2026
Preventive Maintenance: The Contractor shall perform preventive maintenance in accordance with manufacturer guidelines. Monthly preventive maintenance visits shall be conducted unless otherwise directed. Calibration: Calibration shall be performed every six (6) months for specified equipment and annually where applicable. All calibrations shall be traceable to NIST standards and documented. Response Time: Contractor shall respond to service calls within 48 hours during normal business days. See attached file.
AvailableW6QK Army Contracting Command (ACC) Apg Natick
Requirements: Material: fabric, when wet, shall hold water to a reasonable amount to positively affect body temp: shall provide protection from high temperature equipment 300 degrees (e.g. hot gun suppressor) for up to 1 second (T) 3 second (O) without causing dermal burning. shall offer resistance from abrasion due to contact with jagged metal and sharp objects. Design: Pants must be compatible with a gunfighter tactical belt (~1 ¾ x ¼ inches), must not impede the hook and pile attachment points of the inner belt to the outer belt to prevent sagging of the outer belt. Hip adjustment points shall securely adjust the waist size of the pant 1" each side (T) 2" each side (O). See attached file.
Posted Date
Mar 2, 2026
Due Date
Mar 16, 2026
Release: Mar 2, 2026
W6QK Army Contracting Command (ACC) Apg Natick
Close: Mar 16, 2026
Requirements: Material: fabric, when wet, shall hold water to a reasonable amount to positively affect body temp: shall provide protection from high temperature equipment 300 degrees (e.g. hot gun suppressor) for up to 1 second (T) 3 second (O) without causing dermal burning. shall offer resistance from abrasion due to contact with jagged metal and sharp objects. Design: Pants must be compatible with a gunfighter tactical belt (~1 ¾ x ¼ inches), must not impede the hook and pile attachment points of the inner belt to the outer belt to prevent sagging of the outer belt. Hip adjustment points shall securely adjust the waist size of the pant 1" each side (T) 2" each side (O). See attached file.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track W6QK Army Contracting Command (ACC) Apg Natick's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database