Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requirement to provide environmental remediation services for the groundwater pump and treatment system operation and semi-annual groundwater monitoring services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Perform landfill gas, groundwater monitoring and sampling services
Posted Date
Jan 1, 2026
Due Date
Feb 5, 2026
Release: Jan 1, 2026
Close: Feb 5, 2026
Perform landfill gas, groundwater monitoring and sampling services
AvailableRelease: Jan 7, 2026
Close: Feb 18, 2026
To provide groundwater monitoring services.
AvailableWork include drilling and installation of groundwater recovery wells/soil vapor extraction wells, tree clearing, trenching and installation of system piping/wiring, construction of treatment system building pad, placement of prefabricated treatment system building, directional boring, connection to existing system piping, connection to existing catch basin, and testing/development of installed piping and wells.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
Work include drilling and installation of groundwater recovery wells/soil vapor extraction wells, tree clearing, trenching and installation of system piping/wiring, construction of treatment system building pad, placement of prefabricated treatment system building, directional boring, connection to existing system piping, connection to existing catch basin, and testing/development of installed piping and wells.
AvailableThe project is to expand the ground water system with two new wells and provide an additional 1.0 MG ground water storage tank and high service pump station for a future interconnection with County. The two new wells will require a skid mounted treatment system along with chemical addition. The treatment system, chemicals, and high service pumps and storage tank will be centrally located down a private drive off Road. Then, approximately 1-mile of 16" water main will connect the new infrastructure to the distribution system. The project includes two new wells, a packaged treatment system, 1-million-gallon ground level storage tank, high service pump station, 4,900 LF of 16" water main, and all system piping and appurtenances.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
The project is to expand the ground water system with two new wells and provide an additional 1.0 MG ground water storage tank and high service pump station for a future interconnection with County. The two new wells will require a skid mounted treatment system along with chemical addition. The treatment system, chemicals, and high service pumps and storage tank will be centrally located down a private drive off Road. Then, approximately 1-mile of 16" water main will connect the new infrastructure to the distribution system. The project includes two new wells, a packaged treatment system, 1-million-gallon ground level storage tank, high service pump station, 4,900 LF of 16" water main, and all system piping and appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis