Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of groundwater expansion and storage infrastructure, including new wells, a treatment system, a 1-million-gallon storage tank, a pump station, and water main installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provision of five-year periodic evaluation of the alternative groundwater sustainability plan (2026 Alt-GSP) and provide support for upcoming annual reports and compliance with the sustainable groundwater management act (SGMA).
Posted Date
Dec 9, 2025
Due Date
Jan 23, 2026
Release: Dec 9, 2025
Close: Jan 23, 2026
Provision of five-year periodic evaluation of the alternative groundwater sustainability plan (2026 Alt-GSP) and provide support for upcoming annual reports and compliance with the sustainable groundwater management act (SGMA).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Coast Guard Academy issued a Combined Synopsis/Solicitation (RFQ No. 70Z03926QCGA00004) to procure winter and spring maintenance and storage services for the M/V MAGURO from December 2025 through June 2026. The solicitation is a Firm-Fixed-Price, Small Business set-aside under NAICS 336611 and requires proposals submitted via email by January 12, 2026 at 8:00 AM EST. Work will be performed at the USCG Academy in New London, CT with a period of performance from January 13, 2026 to June 15, 2026.
Posted Date
Jan 2, 2026
Due Date
Jan 12, 2026
Release: Jan 2, 2026
Close: Jan 12, 2026
The U.S. Coast Guard Academy issued a Combined Synopsis/Solicitation (RFQ No. 70Z03926QCGA00004) to procure winter and spring maintenance and storage services for the M/V MAGURO from December 2025 through June 2026. The solicitation is a Firm-Fixed-Price, Small Business set-aside under NAICS 336611 and requires proposals submitted via email by January 12, 2026 at 8:00 AM EST. Work will be performed at the USCG Academy in New London, CT with a period of performance from January 13, 2026 to June 15, 2026.
AvailableChemical resistant coating for caustic chemical bulk storage tanks for 2026.
Posted Date
Dec 31, 2025
Due Date
Jan 29, 2026
Release: Dec 31, 2025
Close: Jan 29, 2026
Chemical resistant coating for caustic chemical bulk storage tanks for 2026.
AvailableProvide supervision, labor, materials for Winter and Spring Maintenance and Storage through June of 2026. Work is to include the following: Fall/winter 2025/2026 work (clin 01): 1. Haul boat out of water.; 2. Pressure wash hull and clean trim tabs and motor brackets.; 3. Seasonal dry storage of vessel.; 4. Stabilize fuel system.; 5. Battery service for winter months.; 6. Winterize raw water system.; 7. Winterize freshwater system.; 8. Holding tank pump out, freshwater rinse, adding deodorizer and antifreeze.; 9. Topside washing.; 10. Generator service and winterization include running generator with fresh water, changing oil, oil filter, and fuel filter, and running antifreeze through cooling system.; 11. Winterize Air Conditioning system.; 12. Winterize Sea Keeper.; 13. YAMAHA 100-hour service on each of four engines as per manufacturer specifications.; 14. Shrink Wrap vessel.; 15. Shrink Wrap Tower. See attached file.
Posted Date
Jan 2, 2026
Due Date
Jan 22, 2026
Release: Jan 2, 2026
Close: Jan 22, 2026
Provide supervision, labor, materials for Winter and Spring Maintenance and Storage through June of 2026. Work is to include the following: Fall/winter 2025/2026 work (clin 01): 1. Haul boat out of water.; 2. Pressure wash hull and clean trim tabs and motor brackets.; 3. Seasonal dry storage of vessel.; 4. Stabilize fuel system.; 5. Battery service for winter months.; 6. Winterize raw water system.; 7. Winterize freshwater system.; 8. Holding tank pump out, freshwater rinse, adding deodorizer and antifreeze.; 9. Topside washing.; 10. Generator service and winterization include running generator with fresh water, changing oil, oil filter, and fuel filter, and running antifreeze through cooling system.; 11. Winterize Air Conditioning system.; 12. Winterize Sea Keeper.; 13. YAMAHA 100-hour service on each of four engines as per manufacturer specifications.; 14. Shrink Wrap vessel.; 15. Shrink Wrap Tower. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →