• Mobilization, demobilization, and site clearing for the 2026 Road Improvement Program at the Lanchester Landfill and Reclamation Center.
• Installation of erosion and sediment controls, including filter socks, inlet protection, and erosion control blanket.
• Grading, compaction, replacement of unsuitable material, and installation of aggregate base and shoulders.
• Road 1 improvements, including its connection to Road 2, with geotextile, aggregate surfacing, aluminum gravel edging, and riprap.
• Road 2 improvements, including slope grading, topsoil placement, aggregate base, and asphalt paving.
• Road 3 improvements, including the flare access road and roadside expansion, with aggregate base, asphalt paving, geotextile, and riprap.
• Milling and resurfacing of selected existing pavement areas.
• Road-edge and slope restoration, including seeding and mulching.
• Installation of four speed bumps and reinstallation of road rails.
• Adjustment of existing electrical rims and repair and refilling of gabion baskets.
• Aggregate compaction testing and preparation of as-built drawings.