Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Chester County Solid Waste Authority
Aerated Static Pile Facility Construction. The Project includes the furnishing of all labor, materials, and equipment necessary to complete the work, which generally consists of the following: Demolition and disposal of structures and asphalt. Excavation, stockpiling and backfilling. Connection to existing electrical utilities. Installation of electrical conduit, cable, equipment, and instruments. Installation of irrigation and contact water piping, and other piping, including all valves, fittings and appurtenances. Installation of contact water sump and process water tank, including associated pumps and controls, and inlet and outlet piping and supports. Installation of concrete slabs and pads, pre-cast concrete walls, bin blocks, and bollards. Installation of trench drains and associated concrete and piping. Installation of aeration fan, piping, pipe supports, valves, instruments and aeration trench components. Installation of asphalt pavement. Installation of an office trailer. Installation of signage and appurtenances. Installation of sprinklers, hoses, heat trace, insulation and appurtenances. Installation of control panel and associated systems. Perform all necessary checkout, start-up, and testing of systems. Provide coordination, shutdown procedures, and connections to existing electric utilities. Providing temporary field offices, storage, sanitary facilities, power, and communication equipment. Surveying, site preparation, erosion and sediment controls and restoration.
Posted Date
May 13, 2026
Due Date
Jun 19, 2026
Release: May 13, 2026
Chester County Solid Waste Authority
Close: Jun 19, 2026
Aerated Static Pile Facility Construction. The Project includes the furnishing of all labor, materials, and equipment necessary to complete the work, which generally consists of the following: Demolition and disposal of structures and asphalt. Excavation, stockpiling and backfilling. Connection to existing electrical utilities. Installation of electrical conduit, cable, equipment, and instruments. Installation of irrigation and contact water piping, and other piping, including all valves, fittings and appurtenances. Installation of contact water sump and process water tank, including associated pumps and controls, and inlet and outlet piping and supports. Installation of concrete slabs and pads, pre-cast concrete walls, bin blocks, and bollards. Installation of trench drains and associated concrete and piping. Installation of aeration fan, piping, pipe supports, valves, instruments and aeration trench components. Installation of asphalt pavement. Installation of an office trailer. Installation of signage and appurtenances. Installation of sprinklers, hoses, heat trace, insulation and appurtenances. Installation of control panel and associated systems. Perform all necessary checkout, start-up, and testing of systems. Provide coordination, shutdown procedures, and connections to existing electric utilities. Providing temporary field offices, storage, sanitary facilities, power, and communication equipment. Surveying, site preparation, erosion and sediment controls and restoration.
AvailableChester County Solid Waste Authority
Drill and construct two replacement groundwater monitoring wells.
Posted Date
Jan 26, 2026
Due Date
Feb 13, 2026
Release: Jan 26, 2026
Chester County Solid Waste Authority
Close: Feb 13, 2026
Drill and construct two replacement groundwater monitoring wells.
Chester County Solid Waste Authority
Furnish and install 6 (six) standard vertical extraction wells and 3 vertical extraction wells with slip casings. Furnish and install approx. 350 LF of 12" of HDPE gas conveyance piping. Furnish and install approx. 130 LF of 6" HDPE gas conveyance piping. Furnish and install approx. 140 LF of 6" HDPE gas conveyance piping in common trench with 2" of HDPE compressed air piping and 4" of HDPE condensate forcemain piping. Furnish and install approx. 130 LF of 2" HDPE compressed air piping and in common trench with 4" HDPE condensate forcemain piping. Furnish and install all wellheads, fittings, valves and appurtenances. Furnish and install 3 (three) vertical extraction well dewatering pumps and appurtenances. Pull and relocate 2 (two) existing vertical extraction well dewatering pumps, including furnishing new tri-hose tubing. Furnish and install 2 (two) LFG isolation valves. Furnish and install 4 (four) force main air relief valves. Abandonment of existing LFG conveyance piping, compressed air piping, and force main piping below grade. Abandonment of 9 (nine) vertical extraction wells; three having slip casings. Surveying, site preparation, erosion and sediment controls and restoration.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Chester County Solid Waste Authority
Close: Dec 17, 2025
Furnish and install 6 (six) standard vertical extraction wells and 3 vertical extraction wells with slip casings. Furnish and install approx. 350 LF of 12" of HDPE gas conveyance piping. Furnish and install approx. 130 LF of 6" HDPE gas conveyance piping. Furnish and install approx. 140 LF of 6" HDPE gas conveyance piping in common trench with 2" of HDPE compressed air piping and 4" of HDPE condensate forcemain piping. Furnish and install approx. 130 LF of 2" HDPE compressed air piping and in common trench with 4" HDPE condensate forcemain piping. Furnish and install all wellheads, fittings, valves and appurtenances. Furnish and install 3 (three) vertical extraction well dewatering pumps and appurtenances. Pull and relocate 2 (two) existing vertical extraction well dewatering pumps, including furnishing new tri-hose tubing. Furnish and install 2 (two) LFG isolation valves. Furnish and install 4 (four) force main air relief valves. Abandonment of existing LFG conveyance piping, compressed air piping, and force main piping below grade. Abandonment of 9 (nine) vertical extraction wells; three having slip casings. Surveying, site preparation, erosion and sediment controls and restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge