CityPA
Posted
Aug 30, 2026
Oct 9, 2026
2026 Sanitary / Storm Sewer Improvement Project
Work includes sanitary / storm sewer improvement.
Description: The City of Auburn seeks sealed proposals for its Public Works Facility Improvement Project, which the New York State Contract Reporter identifies as a DPW master plan RFP. Interested architectural and engineering consulting firms may attend a nonmandatory site walkthrough. Proposals must be emailed or delivered to the city’s Department of Engineering Services by October 30, 2026, at 11:00 a.m. local time.
City · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Posted
Aug 30, 2026
Oct 9, 2026
Work includes sanitary / storm sewer improvement.
CityPA
Posted
Sep 28, 2026
Oct 14, 2026
Installation of a Duplex Grinder Pump Station, 1,300 LF of 1-1/2" DR 11 force main piping (installed via directional drilling), five flushing connections, connection to an existing sewer, abandonment of existing system and all required electrical connections.
CityTX
Posted
Sep 30, 2026
Oct 29, 2026
The major work will consist of the (approximate) following: 2,500 LF 7" curb and gutter; 3,800 SF 6" concrete driveway; 12,000 SF 4" concrete sidewalk; 4,700 SY 3" asphalt pavement, superpave sp-d; 4,700 SY 11" pavement pulverization; 76 TN cemlime™; 18 EA barrier free ADA ramp.
CityNC
Posted
Sep 4, 2026
Oct 8, 2026
Construction of new site infrastructure for a future town public works facility. The work consists of clearing and grubbing, site grading, stormwater infrastructure, site lighting, fencing and gates, and paving.
Decision makers connected to this RFP from City of Auburn.