CityIL
Aug 13, 2026
Closes
Aug 26, 2026
Liberty Trail Resurfacing Project RFP
Work includes mill and replace 60,000 SF of liberty trail (6,000 LF x 10' w); mill and replace 4,600 SF of entrance trail (460 lf x 10' w); mill and replace to a depth of 3" sloping no more than 2% to the south; liberty trail has (1) pedestrian bridge, 28' x 20', over the spillway between 3104 and 3106 sable oaks rd; liberty trail has (1) storm sewer manhole and (1) potable water shut off within the area to be milled and replaced; replace detectable warnings, and sidewalks at intersections; repair /grade / seed all soil 2' out from trail edge and replace all wooden trail bollards with 52" yellow polyethylene bollards.