Closing soon

Liberty Trail Resurfacing Project

Description: Work includes mill and replace 60,000 SF of liberty trail (6,000 LF x 10' w); mill and replace 4,600 SF of entrance trail (460 lf x 10' w); mill and replace to a depth of 3" sloping no more than 2% to the south; liberty trail has (1) pedestrian bridge, 28' x 20', over the spillway between 3104 and 3106 sable oaks rd; liberty trail has (1) storm sewer manhole and (1) potable water shut off within the area to be milled and replaced; replace detectable warnings, and sidewalks at intersections; repair /grade / seed all soil 2' out from trail edge and replace all wooden trail bollards with 52" yellow polyethylene bollards.

Buyer
City of Bloomington

City · IL, US

Released
Aug 13, 2026
Closes
Aug 26, 2026(7 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts