CityOH
Aug 3, 2026
Closes
Aug 17, 2026
2026 Street Improvement Project RFP
Work associated with the base bid consists of pavement planing, application of tack coat, partial-depth pavement repairs, and placement of an asphalt surface course.
Description: Work includes street improvement.
City · OH, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Berea.
Adjacent opportunities open for bidding right now.
CityOH
Aug 3, 2026
Closes
Aug 17, 2026
Work associated with the base bid consists of pavement planing, application of tack coat, partial-depth pavement repairs, and placement of an asphalt surface course.
CityMD
Aug 6, 2026
Closes
Sep 4, 2026
Perform asphalt work within the corporate limits of the town. This will include approx 13,000 SY of asphalt milling and overlay on town streets consisting of the following: mill out existing asphalt to 2" depth; clean and tack coat existing asphalt; install 2" of hot mix surface asphalt (type 9. 5mm 64-22); re-install any speedbumps milled away; complete striping of pavement.
CountyGA
Nov 24, 2025
Closes
Dec 29, 2026
Sealed bids sought for Walnut Street roadway improvement construction — full general construction services (labor, materials, traffic control, underground utility verification, ADA compliance, site restoration). Key requirements: mandatory pre-bid attendance, 5% bid bond, 100% performance and payment bonds, specified insurance limits and additional insureds, 135-calendar-day completion from notice to proceed, and quarterly subcontractor/supplier reporting. MW/DBE participation encouraged.
Special DistrictAZ
Aug 5, 2026
Closes
Sep 3, 2026
Work consist of 391 cy of excavation below grade, rock removal, 585 lf of 6" c900 pvc pipe, 4" c900 pvc pipe, 91 lf of 1" polyehylene service tubing, 3 ea of service line connections, 3 ea of 6" gate valves and boxes, 1" air release valves, 194 sy of pavement removal and replacement, 8" c900 pvc pipe.