Street Improvement Project 2026 - BPM058308 RFP
Aug 6, 2026
Closes
Sep 4, 2026
Perform asphalt work within the corporate limits of the town. This will include approx 13,000 SY of asphalt milling and overlay on town streets consisting of the following: mill out existing asphalt to 2" depth; clean and tack coat existing asphalt; install 2" of hot mix surface asphalt (type 9. 5mm 64-22); re-install any speedbumps milled away; complete striping of pavement.